| History | |
| Start of Investigation | January 1948 |
| Start of Construction | August 1956 |
| Date of Operation | May 1960 |
| Installed Capacity | 100,000 KW ( 4 x 25,000 KW) |
| Energy Capability | 516,000,000 KWH |
| General | |
| Drainage area at dam site | 936 KM2 |
| Gross head | 155 m |
| Maximum Discharge | 838 cms |
| Minimum Discharge | 9.8 cms |
| Maximum Reservoir Level | Elev. 579.50 m.a.s.l. |
| Minimum Reservoir Level | Elev. 555.00 m.a.s.l. |
| Usable Storage | 48.2 MCM |
| Total at FSL | 22.83 MCM |
| Present MSL @ 563 m.a.s.l. | 5.27 MCM |
| Live Storage (MSL to FSL) | 17.56 MCM |